by Owen Vaughan | Feb 6, 2014 | reline
This is a CM Furnaces 1700C elevator kiln that we had done emergency roof repairs 3 years before doing the major hot face repairs. The scope of work included picking the furnace shell up from our customer and installing the lining in our shop. We removed heating...
by Owen Vaughan | Feb 6, 2014 | reline
A large gas fired shuttle kiln with recuperative burners was relined with a 9″ thick bubble alumina anchor brick hot face that was tied back to the shell. This is a used kiln that was originally in europe and was not in operating condition. Prairie redesigned...
by Owen Vaughan | Feb 2, 2014 | reline
This CM Furnaces model # CM 1516H2GSFC was relined onsite with a new insulation package and Moly heating elements. The insulation had been thoroughly attacked by the Hydrogen gas used in firing and had no strength.
by Owen Vaughan | Feb 2, 2014 | reline
This Nabertherm N440 was overtemped and in need of a full reline. We picked the unit up and brought back to our shop. The reline included New backup insulation, brick, base plate, thermocouple, heating elements and element holders. We fabricated the elements and...